DELLOK Pin Studded Steel Tubes Tubular Heaters Power plant
About Us
Dellok(YONGHUI Radiating Pipe Manufacturing Co.,Ltd) was established in 2002, which is located in Nanjing, China.We joined HARBIN AIR CONDITIONING CO., LTD. in 2022 and became the most professional industry manufacturer in China. After many years of development, the company now has 66 million yuan in fixed assets, more than 200 employees, and 33 technical staffs. We have 4 aluminum processing production lines, with the annual processing capacity of more than 20,000 tons; And we have 5 tube-drawing production lines; 47 fintube production lines, 1 imported production line from American with the brand of McElroy , with the annual production capacity of 12 million meters the above.
Quality is the theme of eternal pursuit of winner.
Studded Tube Product Description:
Steel studded tubes are used instead of finned tubes for heat transfer in the processing industries, generally in furnaces, gas turbines, fired heaters and furnace applictions where the surface is exposed to a very corrosive environment and where very dirty gas streams require frequent or aggressive cleaning.
The steel studs are automatically resistance welded to the tube, producing high quality forge welds. The welding process enables the combination of any grades for studs and tube: carbon, low alloy, stainless steels and high nickel alloys. Alloy steel pipes are stress-relieved after studding, according to the relevant specifications for the class and grade of steel used.
Studded Tube(Stainless Steel Welded Tube) Manufacturing Process:
Studs are fully automatically welded onto the tubes (pipes) by resistance welding.
Studded Tube(Welded Stainless Tube) Advantages:
To increase the surface area of the tube and to protect tube surface from direct exposure to heat /corrosive environment.
Studding reduces the amount of bare pipes used in these processes. Heat transfer surface of one studded pipe is equivalent to surface of 4 to 10 bare pipes.
Use of studded tubes is ideal for processes/applications, where dirty fuels are used in harsh environments.
Studded Tube(Black Welded Pipe) Properties:
Wear proof design
High heat transferring capacity
Studded Tube(Weld Galvanized Pipe) Applications:
Boiler,Super heater, Gas furnace burner, heat exchange equipment ,chemical equipment,heat recovery of the petrochemical industry, in areas of convection ovens, vacuum generators for chemical processing, etc.Boiler stud tube,Super heater stud tube, Gas furnace burner stud tube.
Studded Tube(Fin Tube) Specifications:
Product Specification | ||
Tube OD | 25~273 (mm) | 1”~10” (NPS) |
Tube Wall Thk | 3.5~28.6 (mm) | 0.14”~1.1” |
Tube Length | ≤25,000 (mm) | ≤82 ft |
Stud Thk | 6~25.4 (mm) | 0.23”~1” |
Stud Height | 10~35 (mm) | 0.4”~1.38” |
Stud Pitch | 8~30 (mm) | 0.3”~1.2” |
Stud Type | Cylindrical, Elliptical, Lens type | |
Stud to tube surface angle | Vertical or Angular | |
Material Combinations | ||
Stud Material | C.S. (most common grade: Q235B) | |
S.S. (most common grade are AISI 304, 316, 409, 410, 321,347) | ||
A.S. | ||
Tube Material | C.S. (most common grade: A106 Gr.B) | |
S.S. (most common grade are TP304,316, 321, 347) | ||
A.S. (most common grade are T/P5,9,11,22,91) | ||
Type of Service | High temperature |
Product Categories : Studded Tube
FAQ
Q1: Are you trading company or manufacturer?
A: We are manufacture factory and we can accept OEM order. Welcome to visit our factory and check our products.
Q2: Can I have a sample ?
A: Yes, welcome to place sample order to test and check quality. Mixed samples are also OK.
Q3: What is your the lead time for production?
A: Generally Sample needs 1-3 days, mass production needs 15-30 days, also depends on your request.
Q4: What is the warranty for your products?
A :We provide one year warranty for the products.
Q5: What payment terms do you accept?
A :Trade assurance,TT,Western Union.